Data Center Construction Security Officer - Abilene, TX

Job Posted 9/2/2026
Salute
Abilene, TX 79720
United States
Category Data Center
Pay
$0.00 to $20.00 Per Hour
Job Description
 
 

Salute is a leading provider of cutting-edge Data Center Infrastructure Services, dedicated to serving data center clients worldwide. We pride ourselves on delivering sustainable solutions, unparalleled reliability, and outstanding customer service. As we continue to grow, we are seeking a dynamic and experienced Data Center Construction Security Officer join our team and drive our relationships with hyperscale clients to new heights.


THIS POSITION IS LOCATED IN ABILENE, TX


Salute Benefits That Put You First

We know life doesn’t stop when work begins, that’s why we offer perks designed to support your well-being, your family, and your future:

  • Time to Recharge: Enjoy 8 company-paid holidays2 floating holidays, and PTO so you can rest, celebrate, and take care of what matters most.
  • Comprehensive Benefits Package: Including Medical, Dental, and Vision that you can enroll in starting on Day 1. Coverage begins the first of the month following 30-days of employment.
  • Peace of Mind: The Employee Assistance Program is available to all employees, even if you do not participate in the benefits package.
  • Your financial future matters: Enjoy our employer-supported 401(K) with immediate 100% vesting, plus a 3% employer match and a 50% match on the next 2%.
  • Wellness Support: Access to HSAmental health resources, and gym discounts—because your health matters.
  • Extra Protection & Perks: Through discounted group programs, such as legal serviceshome & auto insurancepet insurance, and ID theft protection for life’s unexpected moments.


Data Center Construction Security Officer:

As a Data Center Construction Security Officer, you will conduct unarmed foot and/or vehicle patrol (interior and/or exterior), control access and egress, monitor closed-circuit televisions and alarm systems compose reports, deter criminal activity, and misconduct, and perform other duties as specified in post orders. The Data Center Security Officer is trained to work on all posts at the assigned site location and is available to work all shifts.

THIS POSITION IS LOCATED IN ABILENE, TX


Responsibilities:

  • Patrol exterior grounds of the facility.
  • Provide access control for gates ensuring only authorized personnel are permitted.
  • Manage traffic flow at gates to ensure no disruption in business operations.
  • Maintain access log.
  • Monitor cameras after normal working hours.
  • Notify your Shift Lead of Supervisor of any issues.
  • Observe and report and suspicious activity
  • Maintain awareness of surroundings to promote physical security and safety; watch for irregular or unusual conditions that may create security concerns or safety hazards
  • Observe departing personnel to protect against theft of company property and ensures that authorized removal of property is conducted within appropriate client requirements
  • Contribute to communication and awareness of security policies and issues as needed; warn violators of rule infractions, such as loitering, smoking or carrying forbidden articles
  • Permit authorized persons to enter property and monitors entrances and exits; control/direct traffic; Observe departing personnel to protect against theft of company property and ensure that authorized removal of property is conducted within appropriate client requirements

Required Qualifications:

  • Customer service experience
  • A team player with a helpful disposition
  • Excellent computer skills
  • High School Diploma or equivalent
  • Able to pass a background check and 10-panel drug screen (zero tolerance drug policy)
  • Texas DPS Guard Card
  • Overtime will be required at times

Physical Requirements:

  • Ability to lift and carry heavy equipment, up to 40lbs.
  • Ability to climb ladders and multiple flights of stairs to access elevated equipment
  • Ability to stand for long periods of time in various work environments
  • Ability to bend, stoop, kneel, and reach for equipment related tasks
  • Basic physical fitness to respond quickly to emergency situations and navigate areas quickly
  • Ability to move quickly and efficiently withing various work environments to troubleshoot issues or respond to emergencies.
  • Good hand-eye coordination and dexterity for working with small components and connectors
  • Clear vision, with or without correction, to perform tasks requiring attention to detail and precision while wearing safety glasses
  • Ability to differentiate between color-coded warning signs, labels, and cables
  • Ability to work in environments with a wide variety temperature inside a facility
  • Ability to work outdoors in various weather conditions, including extreme temperatures, rain, or snow
  • Capability to work in environments with elevated noise levels while wearing hearing protection
  • Possession of a valid driver’s license for work-related travel, as required

If your professional growth and compensation trajectory are restricted in any way, consider –  

  • Stepping into a role with a nationally recognized leader in the Mission Critical market
  • Working with an employer who maintains a corporate philosophy to hire only our nation’s best
  • Who invests in and are unilaterally committed to continuing the enrichment of their employees

If you are a motivated and results-driven individual with a passion for data center services and a knack for building strong client relationships, we want to hear from you. Join us in revolutionizing the data center industry and apply today! 

 

Salute is an equal opportunity employer committed to celebrating diversity, creating an inclusive environment for all employees, and providing equal employment opportunities to all applicants; if you require a reasonable accommodation to participate in the job application or interview process, perform essential job functions, or receive other benefits and privileges of employment, please contact our Human Resources department at hr@saluteinc.com for more information.


THIS POSITION IS LOCATED IN ABILENE, TX


Compensation & Benefits Disclosure

The base salary range for this role is $20/HR This range reflects a goodfaith estimate of what we reasonably expect to pay upon hire, based on factors such as skills, experience, education, and market/location. Our comprehensive benefits include health, dental, and vision insurance, Health Savings Account (HSA), gym discount, mental health, Discounted Group Life & AD&D, Discounted Group Short & Long-term Disability, 401(k) retirement matching, PTO/paid holidays, and parental leave. Final compensation will be determined by jobrelated factors consistent with applicable law.






SHIFTS: Sunday - Tuesday w/ every other Wednesday OR Thursday - Saturday w/ every other Wednesday (DAYS & NIGHTS)
DAYS: 6am - 6pm (12 hr shifts)
NIGHTS: 6pm - 6am (12 hr shifts)
Employer



United States
Similar Jobs
VP of Energy Solutions - (Owner's Representative) - Data Center Construction
Posted 9/8/2026
Dallas, TX
$180,000.00 to $270,000.00 Per Year
The VP of Energy Solutions will serve as a senior leader responsible for the strategy, development, engineering, commercial structuring, and ...
Operations Manager – Data Center Construction – Dry Utilities
Posted 9/8/2026
Grand Prairie, TX
About Us NorthStar Energy Solutions, a Quanta Services, Inc. (NYSE:PWR) company, is headquartered in Grand Prairie, TX and opera ...
Senior Electrical Project Manager - Data Center Construction
Posted 9/8/2026
Austin, TX
$115,700.00 to $161,966.69 Per Year
At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the ...
Project Manager / Owner's Representative - Data Center New Construction - Abilene, TX
Posted 9/8/2026
Abilene, TX
Company DescriptionTurner & Townsend is a global professional services company with over 22,000 people in more than 60 countries.  Worki ...
Senior Mechanical Estimator - Data Center Construction
Posted 9/8/2026
Abilene, TX
Company DescriptionTurner & Townsend is a global professional services company with over 22,000 people in more than 60 countries. Workin ...