Construction Scheduler - Columbus, OH

Job Posted 11/5/2026
Embark Recruiting Solutions
Columbus, OH
United States
Job Description

 Title: Construction Scheduler

Location: Columbus, OH

Duration: Direct Hire

Our client, located in Columbus OH, has an immediate need for a Scheduler. This is a direct hire / full time position. Details are as follows:

  • The scheduler shall have an in-depth knowledge of construction practices and sequencing
  • The construction scheduler shall review construction schedules with supporting documentation and provide reports to project team
  • Analyze scheduling scenarios to assist the project team
  • The scheduler shall demonstrate the ability to prepare a Critical Path Schedule (CPM)
  • Assist the Project Team in evaluating and monitoring the Contractors progress schedule as well as consulting and troubleshooting issues throughout the construction of the project
  • The scheduler shall have excellent computer skills with in-depth knowledge of Primavera P6 scheduling software and Microsoft Project.
  • Ability to utilize Microsoft Office products, specifically Word and Excel will be required

 Experience:

  • Must have a minimum of 3-5 years’ scheduling experience
  • BS degree in Civil Engineering or Building/Construction Management is preferred
  • Strong background using Primavera P6 scheduling software
  • Experience with construction schedules for the design-build phase of the projects
  • Critical Path Method (CPM) scheduling knowledge/experience and the ability to analyze schedules to determine duration and logic issues
  • Experience developing detailed resource loaded design and construction schedules, and preparing progress/status reports and performance of earned value analysis
  • Experience with time impact analysis
  • Construction claims and change order experience is preferred
  • Construction scheduler should have experience integrating the construction schedule into the master schedule
  • Candidate must be able to demonstrate excellent verbal and written communications skills
  • The scheduler shall have excellent computer skills with in-depth knowledge of Primavera P6 scheduling software and Microsoft Project.
  • Ability to utilize Microsoft Office products, specifically Word and Excel will be required

 

 
Employer
Similar Jobs
Construction Project Superintendent (Ohio)
Posted 11/12/2026
Cleveland, OH
Construction Project Superintendent Overview - 100% Employee-Owned Company For more than 40 years, The Douglas Company has been controlling ...
Construction Superintendent
Posted 11/12/2026
Cleveland, OH
$70,000.00 to $120,000.00 Per Year
Job Summary We are seeking an experienced Construction Superintendent to lead on-site operations for commercial construction projects in the ...
Project Manager II (Construction)
Posted 11/12/2026
Cleveland, OH
$98,000.00 to $120,000.00 Per Year
Description Position at Leopardo Construction Leopardo is looking for a project manager to grow with our our Cleveland market! This is a ...
Construction Superintendent
Posted 11/12/2026
Cleveland, OH
The Krill Co., Inc. is actively seeking a dynamic and experienced professional to join our team as a Senior Project Superintendent.As a lead ...
Construction Manager
Posted 11/12/2026
Beachwood, OH
$79,000.00 to $99,000.00 Per Year
DescriptionGENERAL PURPOSE OF THE JOB: The Construction Manager is responsible for managing all projects (including GC and larger-scale P&am ...
Construction Project Manager IV (51919)
Posted 11/12/2026
Cleveland, OH
$100,000.00 to $115,000.00 Per Year
DescriptionJoin a company where excellence meets opportunity! At MIRACORP, we don’t just provide services to the federal government, we set ...