Construction Scheduler

Job Posted 4/26/2026
Embark Recruiting Solutions
Charlotte, NC 28216
United States
Job Description
Title: Construction Scheduler

Location: Charlotte, NC

Duration: Direct Hire

Our client, located in Charlotte NC, has an immediate need for a Scheduler. This is a direct hire / full time position. Details are as follows:

  • The scheduler shall have an in-depth knowledge of construction practices and sequencing
  • The construction scheduler shall review construction schedules with supporting documentation and provide reports to project team
  • Analyze scheduling scenarios to assist the project team
  • The scheduler shall demonstrate the ability to prepare a Critical Path Schedule (CPM)
  • Assist the Project Team in evaluating and monitoring the Contractors progress schedule as well as consulting and troubleshooting issues throughout the construction of the project
  • The scheduler shall have excellent computer skills with in-depth knowledge of Primavera P6 scheduling software and Microsoft Project.
  • Ability to utilize Microsoft Office products, specifically Word and Excel will be required

Experience:

  • Must have a minimum of 3-5 years’ scheduling experience
  • BS degree in Civil Engineering or Building/Construction Management is preferred
  • Strong background using Primavera P6 scheduling software
  • Experience with construction schedules for the design-build phase of the projects
  • Critical Path Method (CPM) scheduling knowledge/experience and the ability to analyze schedules to determine duration and logic issues
  • Experience developing detailed resource loaded design and construction schedules, and preparing progress/status reports and performance of earned value analysis
  • Experience with time impact analysis
  • Construction claims and change order experience is preferred
  • Construction scheduler should have experience integrating the construction schedule into the master schedule
  • Candidate must be able to demonstrate excellent verbal and written communications skills
  • The scheduler shall have excellent computer skills with in-depth knowledge of Primavera P6 scheduling software and Microsoft Project.
  • Ability to utilize Microsoft Office products, specifically Word and Excel will be required